Scope of work
The City of Northport is seeking materials for a Safe Streets for All (SS4A) demonstration grant project. Raised curb channelizers are included in the scope of this project See the related PDF documents for detailed specifications and response instructions. See Traffic Calming Project #1 - Hunter Creek Rd near Lakeshore Drive, Traffic Calming Project #2 - Hunter Creek Road near Diamond Ln, and Traffic Calming Project #5 - 26 th Ave at 32 nd St in the Northport SS4A Concepts related document (PDF). There are dimensions and delineator spacing call outs. This should be enough information to determine the number of end caps and delineators. 36" is the preferred delineator size. Tubular is the preferred style. The delineators along centerlines should be yellow (project #1 & project #5) and white along the pavement edge line (project #2). See section 707 in the ALDOT construction specification book for sheeting color and size. The sheeting color should be reflective white on the delineators. Two - 3" bands would appropriate for size. As long as the delineators are similar in kind to those listed in the ALDOT approved materials publication , they should be acceptable to use.
Opportunity details
- Issuing agency
- City of Northport
- Location
- Northport, Alabama
- Category
- Equipment & supplies
- Notice type
- Bid notice
- Published
- Oct 13, 2026
- Source status
- Not present in latest complete source listing
- Eligibility / qualifications
- Responses shall be in the format of a PDF proposal submitted no later than 4:00 PM CDT on 10/29/2026.
Documents & addenda
- ALDOT construction specification bookAccess checked Oct 29, 2026, 7:31 PM UTCSource file
- ALDOT approved materials publicationAccess checked Oct 29, 2026, 7:31 PM UTCSource file
- Northport SS4A Package No. 2 REVISED - Curb ChannelizersAccess checked Oct 29, 2026, 7:31 PM UTCSource file
- Northport SS4A Concepts - Pedestrian and Traffic Calming Projects PDFAccess checked Oct 29, 2026, 7:31 PM UTCSource file
Source notes
- The notice was absent from the most recent complete source listing. Its final disposition needs confirmation.
Observed changes
Directory record updated: eligibility.
Directory record updated: source status, verification status.