Scope of work
Replace the Ross Springs–Red Canyon waterline in the Flaming Gorge Ranger District, Ashley National Forest, Daggett County, Utah. The pricing schedule specifies 4,475 linear feet of 4-inch HDPE pipeline as a designed quantity, with associated valves, drains, utility boxes and lateral connections. Work also includes covering approximately 1,150 feet of existing pipeline with imported fill; the replaced asbestos-cement main is to be abandoned in place. Total small-business set-aside, NAICS 237110. Completion is required within 90 calendar days after notice to proceed; the SOW anticipates a spring 2027 start. No organized site visit is scheduled; independent visits are encouraged. Quotes are due November 21, 2026 at 3:00 PM Mountain Time.
Opportunity details
- Issuing agency
- USDA Forest Service
- Location
- Utah
- Category
- Water & environment
- Notice type
- Combined Synopsis/Solicitation
- Published
- Oct 26, 2026
- Source status
- Published latest notice, not cancelled or archived
Documents & addenda
- C04a SF-1442 1240LT27Q0022.pdfAccess checked Oct 28, 2026, 1:53 PM UTCSource file
- C04b 1240LT27Q0022.pdfAccess checked Oct 28, 2026, 1:53 PM UTCSource file
- C04c SOW 1240LT27Q0022.docxAccess checked Oct 28, 2026, 1:53 PM UTCSource file
- C04d Plans 1240LT27Q0022.pdfAccess checked Oct 28, 2026, 1:53 PM UTCSource file
- C04e WD Daggett County Utah 1240LT27Q0022.pdfAccess checked Oct 28, 2026, 1:53 PM UTCSource file
Source notes
- The SAM description, SOW opening narrative and drawing cover say 4,450 feet, while C04b pages 1–2 specify 4,475 feet and schedule item 221100-3 marks it DQ. SOW section 011250 defines DQ as the final payable units shown in the Schedule of Items, subject to its change procedures. Incorporated FAR 52.212-4(r) also gives the schedule precedence over attachments/specifications. This listing uses the 4,475-foot scheduled quantity and does not claim the conflicting narrative was amended.
- C04b page 14 retains HVAC-related experience and equipment lead-time wording, including the alternative of similar mechanical work. These submission instructions remain in the official packet; the listing does not waive them or add HVAC installation to the scheduled waterline work.
- C04b page 5 contains an informational Aircraft Mechanic/$XX.XX placeholder and several service-template clauses. That table expressly is not a wage determination. The attached Daggett County heavy-construction wage determination and the applicable contract clauses must be consulted.