Scope of work
Reconstruct portions of Tony Grove Dam in Cache County, Utah, including replacing outlet works, raising the dam crest and adding embankment material. The base work includes excavation and fill, reinforced-concrete structures, piping, a slide gate, slope protection, instrumentation and quality control. Options cover a precast vault restroom and asphalt paving. The required performance period is June 1 through October 1, 2027. This is a total small-business set-aside under NAICS 237990, with a stated $45 million size standard and estimated construction magnitude of $1 million to $5 million. Active SAM registration, pricing for all items and a 20% bid guarantee for quotes above $150,000 are required. The organized October 15 site visit was described as urged and expected, without mandatory-attendance language. Amendment 01 extends quotes to November 20, 2026 at 5 p.m. Mountain Standard Time. Review the pricing-workbook warning before bidding.
Opportunity details
- Issuing agency
- USDA Forest Service
- Location
- Garden City, Utah
- Category
- Construction & infrastructure
- Notice type
- Combined Synopsis/Solicitation
- Published
- Oct 21, 2026
- Source status
- Published latest notice, not cancelled or archived
Documents & addenda
- C05 Amendment 01 Tony Grove.pdfAccess checked Oct 28, 2026, 1:54 PM UTCSource file
- C04 Attachment 4 - Drawings Tony Grove.pdfAccess checked Oct 28, 2026, 1:54 PM UTCSource file
- C04 Attachment 3 - Specifications Tony Grove.pdfAccess checked Oct 28, 2026, 1:54 PM UTCSource file
- C04 Attachment 5 - DBA WD UT20260105 Cache Co 051826.pdfAccess checked Oct 28, 2026, 1:54 PM UTCSource file
- C04 Attachment 1 - Solicitation Tony Grove.pdfAccess checked Oct 28, 2026, 1:54 PM UTCSource file
- C04 Attachment 2 - SOI Tony Grove.xlsxAccess checked Oct 28, 2026, 1:54 PM UTCSource file
Source notes
- The official Schedule of Items workbook has a subtotal defect: cell G29 sums G13:G28 and omits base-item totals G4:G12; G39 uses that subtotal. Base units and quantities also reference an external workbook, although cached values are present. Solicitation page 23 permits Excel or PDF submission, requires pricing every item and states that unit prices govern extension errors. Verify the complete pricing schedule with the contracting officer before bidding.