Scope of work
Replace ceiling tiles and support systems in the Salem Ranger District main floor and basement and install ceiling systems in specified Doniphan office areas in Mark Twain National Forest, Missouri. The controlling Basis of Design requires metal systems, a maximum 3-inch short-drop alternative at Salem, specified acoustic ratings, independent fixture support and associated electrical and HVAC work. Salem bathrooms are excluded. Amendment 0001 allows 60 days for on-site construction.
Opportunity details
- Issuing agency
- USDA Forest Service
- Location
- Salem, Missouri
- Category
- Construction & infrastructure
- Notice type
- Solicitation
- Published
- Oct 22, 2026
- Source status
- Published latest notice, not cancelled or archived
Documents & addenda
- Amd-0002_12445527Q0003.pdfAccess checked Oct 28, 2026, 1:54 PM UTCSource file
- Att 02_Specifications_261015.pdfAccess checked Oct 28, 2026, 1:54 PM UTCSource file
- Att 05_Design Clarification_261013.docxAccess checked Oct 28, 2026, 1:54 PM UTCSource file
- Amd-0001_12445527Q0003.pdfAccess checked Oct 28, 2026, 1:54 PM UTCSource file
- Q_and_A-12445527Q0003.xlsxAccess checked Oct 28, 2026, 1:54 PM UTCSource file
- Exhibit A_Additional Salem photos.pdfAccess checked Oct 28, 2026, 1:54 PM UTCSource file
- Exhibit B_Doniphan Photos.pdfAccess checked Oct 28, 2026, 1:54 PM UTCSource file
- Exhibit C_Salem Office Existing.pdfAccess checked Oct 28, 2026, 1:54 PM UTCSource file
- Exhibit D_Salem Asbestos Report.pdfAccess checked Oct 28, 2026, 1:54 PM UTCSource file
- Sol_12445527Q0003.pdfAccess checked Oct 28, 2026, 1:54 PM UTCSource file
- Att 01_Schedule of Items_260820.docxAccess checked Oct 28, 2026, 1:54 PM UTCSource file
- Att 03_Wage Rates-Dent_260518.pdfAccess checked Oct 28, 2026, 1:54 PM UTCSource file
- Att 04_Wage Rates-Ripley_260518.pdfAccess checked Oct 28, 2026, 1:54 PM UTCSource file
- HOW TO FOLLOW PROJECTS ON SAM FOR EMAIL ALERTS.pdfAccess checked Oct 28, 2026, 1:54 PM UTCSource file
Source notes
- Use the Amendment 0002 Basis of Design over residual original wording: metal only, no PVC, a 3-inch maximum Salem drop, and bathrooms excluded. Performance is 60 days under Amendment 0001.
- The historical 1994 report shows no asbestos detected in highlighted ceiling-tile samples but positive asbestos values in other materials. It is not an all-materials clearance. Follow official differing-site-condition instructions.
- Electrical and fixture work and Salem basement vent modifications are included. Simultaneous sites need separate authorized superintendents. Exhibits A–C are reference information under the Q&A.