Scope of work
Reconstruct the Buckboard Marina raw-water intake and irrigation infrastructure in Ashley National Forest, Sweetwater County, Wyoming. Base work includes intake drilling and cofferdam work, pumps and pumphouse, raw-water pipeline/storage, access road, power and communications, and design/build electrical and SCADA systems. Five separately identified options cover finished-water storage tanks, looped distribution, water meters, a 40-GPM treatment-plant upgrade, and a waterline extension to a future dock. This is a total small-business set-aside with active SAM registration required. Use Amendment 0003 and its revised scope, specifications and Schedule of Items, and acknowledge all amendments with the quote.
Opportunity details
- Issuing agency
- USDA Forest Service
- Location
- Mc Kinnon, Wyoming
- Category
- Construction & infrastructure
- Notice type
- Combined Synopsis/Solicitation
- Published
- Oct 21, 2026
- Source status
- Published latest notice, not cancelled or archived
Documents & addenda
- C04g Options Supplement 1240LT26Q0109 102026.pdfAccess checked Oct 28, 2026, 1:54 PM UTCSource file
- C04e Measurement PYMT Spec 1240LT26Q0109 102026.pdfAccess checked Oct 28, 2026, 1:54 PM UTCSource file
- C04 SF30 1240LT26Q0109-0003.pdfAccess checked Oct 28, 2026, 1:54 PM UTCSource file
- C04f New SOI 1240LT26Q0109 102026.xlsxAccess checked Oct 28, 2026, 1:54 PM UTCSource file
- C04d Measurement PYMT Sup 1240LT26Q0109 102026.docxAccess checked Oct 28, 2026, 1:54 PM UTCSource file
- C04a RFI QA 1240LT26Q0109 102026.docxAccess checked Oct 28, 2026, 1:54 PM UTCSource file
- C04c New Specs 1240LT26Q0109 102026.docxAccess checked Oct 28, 2026, 1:54 PM UTCSource file
- C04b New SOW 1240LT26Q0109 102026.docxAccess checked Oct 28, 2026, 1:54 PM UTCSource file
- C05a Site Visit 1240LT26Q0109.pdfAccess checked Oct 28, 2026, 1:54 PM UTCSource file
- C05 SF30 1240LT26Q0109-0002.pdfAccess checked Oct 28, 2026, 1:54 PM UTCSource file
- C05 SF30 1240LT26Q0109-0001.pdfAccess checked Oct 28, 2026, 1:54 PM UTCSource file
- C04c Attachment 3 Plans 1240LT26Q0109.pdfAccess checked Oct 28, 2026, 1:54 PM UTCSource file
- C04b Attachment 2 Specifications 1240LT26Q0109.pdfAccess checked Oct 28, 2026, 1:54 PM UTCSource file
- C04d Attachment 4 General Decision WY20260044 07302026.pdfAccess checked Oct 28, 2026, 1:54 PM UTCSource file
- C04 SF1442 1240LT26Q0109.pdfAccess checked Oct 28, 2026, 1:54 PM UTCSource file
- C04f Attachment 6 Site Visit 1240LT26Q0109.docxAccess checked Oct 28, 2026, 1:54 PM UTCSource file
- C04e Attachment 5 RFI Form 1240LT26Q0109.docxAccess checked Oct 28, 2026, 1:54 PM UTCSource file
Source notes
- Total Small Business Set-Aside; NAICS 237110. The solicitation states a $45 million small-business size standard and estimated construction magnitude $1 million-$5 million. Active SAM registration is required to submit a quote.
- Bid guarantee of 20 percent of bid price, performance/payment bonds, and the attached Davis-Bacon wage determination apply. Submit the required signed offer, revised pricing schedule, technical/past-performance proposal and bid-guarantee documentation.
- The organized site visit occurred September 24, 2026 at 1:00 PM Mountain Time. The reviewed documents do not state that pre-bid attendance was mandatory.
- Amendment 0003 supersedes prior response dates with November 17, 2026. Use the revised SOW, specifications, measurement/payment documents, Schedule of Items and options supplement; the old SOI is deleted on SAM.
- The October 21 RFI package states USACE permitting was still in progress and provides a stated bid basis for cofferdam/reservoir conditions. Do not interpret document capture as confirmation that construction permits have been issued.